3-14
Powerware
®
9390 UPS (40–80 kVA) Installation and Operation Manual S 164201535 Rev C
Parallel System Installation Checklist
- Each cabinet in the parallel system is placed in its installed location.
- All c onduits and cables are properly routed to the UPMs and to the parallel tie or distribution cabinet.
- All power cables are properly sized and terminated.
- ThebypasssourcefeedingtheoptionalbypassoftheparalleltiecabinetandtheUPMsisfromthesame
source of supply and is a four-wire wye configuration.
- A ground conductor is properly installed.
- Computer Area Network wiring between the UPMs is properly installed.
- Backup control (pull chain) wiring between the UPMs is properly installed.
- Adequate workspace exists around the UPMs, parallel tie cabinet, and other cabinets.
- Startup and operational checks are performed by an authorized Powerware Customer Service Engineer.
Page view 35